AaltoBridge Stock Clearance

Winter 2020

AaltoBridge

Assembling the bridge

The AaltoBridge deck is produced using the patented WLT® technique. The bridge can be fully customised to the requirements of measures, railing or colour. Usual sites are yards, parks and natural parks for light traffic.

AaltoBridge

- Fast and simple installation.
- Cost efficient.
- Strong, elegant and slender solution.
- Ecological, reusable, recyclable and glue free.
- Customised size and shape.

Aalto Haitek Ltd. is a leading sustainable company that designs, develops and manufactures innovative, healthy, chemical- and glue-free massive timber products for wood building and the construction industry. Our patented technologies are rooted in Finnish know-how stretching back six generations. We are an active part of the growing bio and circular economy.

AaltoBridge

  • Bridge deck 7m
    Regular price
    €3.500,00
    Sale price
    €3.500,00
    Regular price
    €9.900,00
    Unit price
    per 
    Sold out
  • Bridge deck 5m
    Regular price
    €2.500,00
    Sale price
    €2.500,00
    Regular price
    €5.900,00
    Unit price
    per 
    Sold out
  • Bridge deck 3m
    Regular price
    €1.500,00
    Sale price
    €1.500,00
    Regular price
    €2.500,00
    Unit price
    per 
    Sold out
  • Railings
    Regular price
    from €600,00
    Sale price
    from €600,00
    Regular price
    Unit price
    per 
    Sold out
  • Ground Support
    Regular price
    €120,00
    Sale price
    €120,00
    Regular price
    Unit price
    per 
    Sold out

---

Added features

- The customisation of campaign products (adjusted width and length measures): 100€ added cost.

- Added strength and load bearing (ca. +250kg/m2) to the campaign bridge solutions, steel stages on both sides from end to end: starting from 800...1500€ added cost, depending on the size.

- Impregnated wood: 50% added cost, according to the campaign prices.

- Surface treatment, toned tar paint: 50% added cost, according to campaign prices.

Delivery and user’s manual

1) Delivery

I.  The bridge parts are packed in a single parcel (card board boxes or pallet), wrapped in plastic cover.

II.  All ordered parts are included, prepared and ready for installation. .

III.  2-4 weeks delivery is reserved for campaign products.

2) Freight

Transport within Finland is included in the purchase of one bridge deck.

3) Customised solutions

I.  Our bridge solution can be made to measure to all its parts, material and according to different needs.

II.  The customisation of campaign products are separately to be agreed upon with our sales representative, sari.lahnalampi@aaltohaitek.fi.

III.  We do also provide customised, turn key and individual solutions including required planning, preparings and installation.

4) User’s manual

I.  The load bearing of the bridge is ca. 150kg/m2 (without stage parts), a sc. walk bridge, including sc. small size garden vehicles. It is not recommended over 1000kg total load (at the same time).

II.  An assembly guide is provided with the purchased products.

III.  It is recommended that the bridge deck is lifted from the ground and water, and that it is lying on top of an elevated base support. The best result and durability is achieved when installed completely straight (horisontal at both ends). The bridge deck is not primarily attached to the base support.

IV.  Untreated wood (in outdoor condition) needs to be surface treated (eg. wood oil och tar treatment). The treatment is recommended to repeat about once a year. Impregnated wood endures about 10 years without treatment, depending on its location and use (moist, sun, soil, frequency and type of use).